Concrete driveways in Anna
Widening a builder drive, adding a pad beside it for a trailer or a boat, or replacing a section that's settled. Same base prep and chaired rebar on every one.
Concrete driveways
Home Service area Anna, TX
Driveways, patios, sidewalks and concrete repair in Anna, twenty minutes north of our base in McKinney. Free estimates, and one crew from tear-out to the last joint.
Anna, TX
Anna roughly doubled in size between 2010 and 2020, and it's still building. Most homes here are new, with builder flatwork that does the job on day one and not much more.
So most of our Anna work is adding on: a wider drive, a patio big enough to use, a side walk to the gate, and pads for sheds and trailers. Each one is tied into the existing slab so the two move together.
New lots also come with fresh grading. We check where the water goes before we form anything, so the new slab doesn't end up holding a puddle against the house.
What we pour in Anna
Every job gets the same base prep, steel and saw-cut joints, whatever the size. Here's what we pour around Anna.
Widening a builder drive, adding a pad beside it for a trailer or a boat, or replacing a section that's settled. Same base prep and chaired rebar on every one.
Concrete driveways
Builder patios extended out into the yard, covered-porch slabs and pads for hot tubs and sheds.
Patios & porches
Side walks to the gate, paths from the drive to the front door and steps where the yard drops, poured level and pitched to drain.
Sidewalks & walkways
Settled panels, cracks and trip hazards, assessed honestly: patched if it will hold, replaced if it won't.
Concrete repairAbout Anna
Anna sits in northern Collin County, with US 75 along its west side. It grew up along the Houston and Texas Central Railway, was named for Anna Quinlan, daughter of George A. Quinlan, and was incorporated in 1913. Its old railroad depot still stands.
The ground is the same Blackland Prairie clay as the rest of the county, swelling after a wet spring and shrinking hard in August. On a new lot that clay often sits under a layer of fill, so we dig through it and compact before anything is poured.
New build or an older place near the depot, the job starts the same way: we come out, look at the levels and the drainage, and tell you what it needs.
Free estimate
Give us the address and a rough idea of what you want poured or pulled out. You'll get a straight answer about what it needs and a week we could do it.
Anna, Texas
One call, one crew, from the tear-out to the last joint cut. Tell us what you're looking at and we'll tell you what it actually needs.